London Mining

London Mining

In connection with the “Iron Ore” project at Mount Isua, GNC has provided technical and mechanical support for London Mining and their sub suppliers since 2008. Mount Isua lies approximately 37 miles inland. At this location, on the Greenlandic ice sheet, two GNC excavators are ready to assist London Mining. The machines were assembled on site after being dismantled and airfreighted to the ice sheet.

Furthermore, GNC has constructed three melting plants for use on the ice sheet, which produce melt water for the drilling teams working on the ice.

GNC has also performed winter inspections of river crossing 1 and 2 and has made surveys in preparation for the establishment of a winter road from the coast to the mine.